FLOOD CONTROL DEPARTMENT
 

The BTC comprise of four districts viz. Kokrajhar, Chirang, Baksa and Udalguri. The main river in Kokrajhar district is River Sankosh and at down stream it is called Gangadhar. River Saralbhanga, Gaurang, Hel River, Aie, Champamati, Dulani are in Chirang district. River Beki, Manas, Puthimari, Kaldia, Pahumara and Borolia in Baksa district. River Dhansiri, Golandi, Nonoi, Kalandi, Baranadi, Kulshik, Rowta, Pagala, Ranganadi are in Udalguri district. Almost all the rivers of BTC originate from foothills of Bhutan. During unprecedented flood of 2004 the above river causes extensive damages by eroding banks and by spilling of riverbanks. The flood water carry heavy silt which get deposited in river-bed as well as agricultural land of some shallow river. Moreover due to outburst of Kurishu dam in Bhutan during 2004 the debris and silt carried by River Beki got deposited at the mouth of rver Manas and Hakua restricted the flow through the above two rivers. Thus all the discharges were flown through the river Beki carriage breach of embankment and river Beki avulsed with river Kalpani at Naraynguri carry extensive damages to Baksa district by inundation and deposit of silt damage to the public and private utilities in 2005 canalisation work at Mathanguri of river Manas was carried out under CRF fund by diverting the flow of river Beki. Partially to the river Manas and the closing work at Naraynguri was done by Barpeta E&D division. Moreover major breach closing work at Bagribari on river Puthimari was carried out in 2005 to save vast area of BTC from inundation closing of avulsion of river Kalpani was also done in 2005 under BTC thus a vast area was saved from erosion and innundation.

Protection from the Erosion of river Tarang
at Borogendrabil
A Group of Farmers attending IPM
training at Kokrajhar.

The following schemes are executed under Kokrajhar W.R. Sub-Division for 2005-06 :

1.
Protection of Jhansibari village and its adjoining areas from the erosion of river Amteka : After completion of this scheme Jhansibari village and its adjoining areas along with the Amteka-Betni road communication have been protected and saved.

2.
Construction of boulder deflector at U/S of existing Bhatarmari Protection works from the erosion of river Gaurang : The scheme was successfully implemented in the proposed time-frame. After completion of the scheme mainly Kokrajhar town and its adjoining areas have been saved from the erosion of river Gaurang.

3.
Protection of Dimalgaon and Kokrajhar-Ramfalbil PWD Road from the erosion of river Gaurang : After completion of the scheme the villages Barman Bazar, Kashibari, Kadamtola, Dimalgaon, Bhatarmari and Kokrajhar town are benefitted and saved from the erosion of river Gaurang.

4.
Protection of Borogendrabil village and adjoining area from the erosion of river Tarang : After completion of the scheme villages Thuribari, Samthaibari, Borogendrabil have been saved from the erosion of river Tarang.
5. Raising and Strengthening of Saralbhanga L/B Embankment : After completion of the scheme the following villages like Maoriagaon, Pakriguri have been benefitted and saved.

Protection of No.1 Amguri (Nayapara)
of river Kanipur
Protection of Laokriguri from the erosion
of river Bhur Nizla

The following schemes are executed under Chirang W.R. Sub-Division for 2005-06 :

1.
Protection of Dahalapara village from the erosion of river Kanibhur : After the completion of the scheme the villages North Asrabari, South Asrabari, Dahalapara, Ranchaidham are saved and benefitted from the erosion of river Kanibhur.

2. Protection of Kauniabhasa (Ujanpara) and Phoolguri village from the erosion of river Chmapamati : After the completion of the scheme villages Kauniabhasa, Ujanpara are saved and benefitted form the erosion of river Champamati.

3.
Protection of Amguri (Nayapara) and adjoining areas from the erosion of river Kanibhur : After the completion of the scheme villages Khagrabari, Amguri are benefitted and saved from the erosion of river Kanibhur.

4.
Protection of South Kajalgaon villages and PWD Road from the erosion of river Kujia : After the completion of the scheme South Kajalgaon village and its adjoining areas are benefitted and saved from the erosion of river Kujia.

5.
Protection of Tilakgaon from the erosion of river Champamati : After the completion of the scheme Batachora, Tilokgaon villages and its adjoining areas are benefitted and saved from the erosion of river Champamati.

6.
Protection of Khagrabari village from the erosion of river Aie : After the completion of the scheme the village Khagrabari and its adjoining areas are saved from the erosion of river Aie on its R/B.

7.
Protection of Kaunibhasa-Mechpara and its adjoining areas from the erosion of river Champamati : After the completion of the scheme Kauniabhasa-Mechpara villages and its adjoining areas are benefitted and saved from the erosion of river Champamati.

8.
Protection of gedergaon village and its adjoining area from the erosion of river Suti : After the completion of the scheme Gendergaon village and its adjoining areas are benefitted and saved from the erosion of river Suti.

9.
Protection of village, Laokriguri, Nakidhora and its adjoining areas from the erosion of river Bhur Nizla : After the completion of the scheme Laokriguri, Nakidhora villages and its adjoining areas are benefitted and saved from the erosion of river Bhur Nizla.

10. Protection of Tirimari village and its adjoining areas from the erosion of river Champamati on its L/B : After the completion of the scheme village Tirimari and its adjoining areas are benefitted and saved from the erosion of river Champamati.

11. Protection of Deolguri village from the erosion of river Champamati on its L/B : After the completion of the scheme Deolguri village and its adjoining areas are benefitted and saved from the erosion of river Champamati.

Protection of Tirimari from the erosion
of river Champamati
Protection of Deolguri from the erosion
of river Champamati

The following schemes are executed under Gossaigaon W.R. Sub-Division for 2005-06 :

1.
Protection of Naigaon village (Batabari) from the erosion of river Saralbhanga (off shute channel) : After the completion of the scheme ongoing erosion and problems of innundation may be saved and the village along with its adjoining areas may be saved and benefitted.

2.
Protection of Ballamjhora village from the erosion of river Pagla : After the completion of the scheme the problem of both ongoing erosion and innundation during flood season the village Ballamjhora and its D/S may be protected and benefitted.

3.
Protection of Nasraibil village from the erosion of river Janali : After the completion of the scheme inhabitants of the village may be protected and benefitted. The village Boshgaon located D/S is also will be benefitted.

4.
Protection of village Janaligaon from the erosion of river Janali : After the completion of the scheme the villages Janaligaon, Janali market, PWD road may be protected from the erosion of river Janali and inhabitants of the area may be benefitted.

5. Construction of Boulder Bund accross avulsion channel on L/B of river Pekua at 7/8 ride : After the completion of the scheme the thickly populated villages namely Lotamari, Hainari, Nandipur may be protected and benefitted.

6.
Protection of Gossaigaon Brahma Seva Ashram from the erosion of river Modati : The scheme has been physically completed and the erosion of the river has been completely checked and benefitted the Brahma Seva Ashram, Agriculture. office, PWD Road of the town and thickly populated homested etc.

7.
Protection of Hatigarh village from the erosion of river Guruphella : After the completion of the scheme the thickly populated village and its adjoining area has been protected along with road, school building and the agricultural field.

8.
Protection of Surendrapur village from the erosion of river Sankosh : The scheme has already been executed and physically completed. The scheme has checked the ongoing aggressive erosion and protected the village and its adjoining area.

9.
Protection of Nawarbhita village from the erosion of river Longa : After the completion of the scheme it is observed that the villages have been properly protected from the ongoing erosion.

Protection of Janaligaon from
the erosion of river Janali
Protection of Kalikola village from
the erosion of river Kalanadi

The following schemes are executed under Udalguri W.R. Sub-Division for 2005-06 :

1.
Protection of Kalikola village from the erosion of river Champamati : After completion of the scheme the following villages are benefitted and saved from the furry erosion of river Kalanadi, namely Kalikola, Sonajuli, Dimakuchi, Amguri and Bokapuri. Now the scheme is functioning successfully.

2. Closing Spill channel of Kulshik river at Khatowalpara village : The scheme is successfully implemented and functioning well. After completion of the scheme mainly Tangla town is saved from the havoc of river Kulshik.

3. Clearing of dead channel of Rowta river at Lamabari area : The following villages are saved from the erosion of Rowta river namely Tikritola, Lamabari Kishanpur, No. 1 & 2 Pathakpur, Ojagourh, Rowtagaon, Betele T.E. etc.

Protection of Khatowalpara from
the erosion of river Kulshik
Protection of Lamabari from
the erosion of river Rowta

The following schemes are executed under Tamulpur W.R. Sub-Division for 2005-06 :

1.
Channelisation to divert the river Kalanadi to its original course at D/S of RCC bridge near Menoka T.E. : After comple-tion of the scheme villages Angrakata, Palashbari, Belkuti etc. are benefitted and saved from the erosion of river Kalanadi.

2. Temporary restoration of Puthimari R/B at Khatpara U/S : After completion of the scheme villages Khatpara and its adjoining areas are benefitted and saved from the active erosion of river Puthimari.

3.
Construction of Bamboo Muharrior and Ring Bund at Kabibari 6.5 km on Puthimari R/B embkt. including temporary measures : After the completion of the scheme villages namely Habibari and its adjoining areas are benefitted and saved from the bank erosion of river Puthimari.

4.
Temporary restoration of Puthimari R/B embkt. at Kelengchok : After completion of the scheme the villages namely Kelengchok and its adjoining areas are benefitted and saved from the bank erosion.

5.
Training of river Solmari to protect the village Bhangbari and its adjoining areas under Kumarikata G.P. against the bank erosion : After completion of the scheme the areas of Bhangbari, Kumarikata Road and adjoining areas under Tamulpur Circle of Baksa district are benefitted and saved from the over topping of the flood water.

6.
Training of river Pagladia on R/B U/S of RCC bridge near village Hakta and Balabari : After completion of the scheme the villages namely Hakata, Balabari and adjoining areas are benefitted and saved from the erosion of river Pagladia.

Channel cutting to divert the river Kalanadi
to its original course at D/S of RCC
bridge near Menoka TE
M & R to Puthimari embkt. on R/B
from Habibari R.G. Rly. line

7. M.E. along B/B of Mora Pagladia from N.H. Way-31 to Tihu Akhara PWD Road (Temporary closure of breach at NB-JULUKI) : After completion of the scheme its adjacent areas are benefitted and saved from the erosion of river Mora Pagladia.

8.
Closing of avulsion of river Motanga (Kalanadi) at the D/S of RCC bridge over Tamulpur-Daranga Road to protected villages under Kumarikata G.P. including Menoka T.E. : After completion of the scheme the vast area of villages Angarkhata, Palashbari, Belghuti and Menoka T.E. under Kumarikata G.P. are benefitted and saved.

9.
Temporary restoration of Puthimari R/B embkt. at Habibari : After completion of the said scheme the villages of Habibari and its adjoining areas are benefitted and saved from the erosion of river Puthimari.

10. Temporary restoration of Puthimari R/B embkt. at Kawaimari : The scheme is completed and the villages namely Kawaimari and its adjoining areas are benefitted and saved from the erosion of river Puthimari.

11.
Temporary restoration of Puthimari R/B embkt. at Dhulabari : After completion of the said scheme Puthimari dyke at Salmara and its adjoining areas are benefitted and saved from the erosion of river Puthimari.

12.
Temporary restoration of Puthimari R/B embkt. at Dholkuch : After the completion of the said scheme the villages, namely Dholkuchi and its adjoining areas are benefitted and saved from the erosion of river Puthimari.

13.
Channel cutting of Sukla river at Niz-Kachula Hirachuba : After completion of the said scheme the Goreswar-Tamulpur PWD Road alnog with the cultivation and homestead land is saved from the change of course and erosion of river Sukla.

14.
Channelisation of Sukla river through its original course at Nidhuwa : After completion of the said scheme the areas of Mukuldanga and Sukla Irrigation Project are saved from diverted course of river Sukla at Nidhywa.

15.
M.E. along B/B of Morapagladia from Batachara to N.H. Road, Barama : After completion of the scheme benefitted and saved the villages namely Batachara, Alajhar, Kalabari and its adjoining area from the erosion of river Morapagladia.

 