The BTC is predominantly inhabited by the
Bodo community who primarily are cultivators.
The economic condition of these people is
very poor and mainly depended on agricultural
earnings. For this reason assured irrigation
system is utmost necessary in this area.
The major rivers on the northern side of
Brahmaputra Valley such as Sonkosh, Gurufella,
Gongia, Saralbhanga, Champamati, Aie, Manash,
Beki, Pagladia, Puthimari, Dhansiri etc.
originating from the Bhutan hills flow through
the heart land of Bodoland Territorial Council
area before meeting the mighty Brahmaputra
river. The incessant downpour of rain during
rainy season in the Bhutan and on the catchments
areas of the above rivers causes flood affecting
agricultural field, live stock and damages
the infrastructure of the different irrigation
schemes of BTAD.
Due to non- availability of fund most of
the irrigation schemes have been lying inoperative
in the BTAD area for the past few years.
The B.T.C. authority has taken steps for
revival as well as to construct some new
irrigation schemes with the limited fund
for the upliftment of the economic condition
of the people in the BTAD area.
|
|
|
|
Borolia Irrigation
Project, Borolia, Baksa
|
Irrigation canal
of Suklai Serfang, Baksa
|
During the year, 2005-06 the B.T.C. authority
has allocated an amount of Rs. 379.00 lakh
to the Irrigation Sector of BTAD. Accordingly
the department has taken steps for improvement
of some existing schemes as well as some
new schemes to tap the rich source of water
bodies, which are abundant within the Council
area to give maximum benefit to the indigenous
population of the 4 (four) districts. The
achievement of Irrigation Department in
the four districts is detailed below district
wise and also in a format to read at a glance.
In the Annual Operation Plan of 2005-06,
the Irrigation Department has taken up 28
(twenty eight) numbers of schemes in total
both new as well as renovation/improvement
of old schemes in Kokrajhar district, out
of which 25 (twenty five) nos. of schemes
are directly related to supplying of irrigation
water for cultivation and 3 (three) nos.
are not irrigation oriented. Out of 25 (twenty
five nos. irrigation oriented schemes, 23
(twenty three) nos. of schemes have been
completed and a total Potential of 5400
hectors. for both Rabi and Kharif crops
have so far been created through the achievement
of these schemes. The remaining 2 (two)
nos. of schemes are also in progress.
|
|
|
|
Amlaiguri F.I.S.
|
Longa F.I.S.
|
In the Annual Operation Plan 2005-06,
the Irrigation Department has taken up 14
(fourteen) numbers of schemes in total both
new as well as renovation/improvement of
old schemes in Chirang District, out of
which 13 (thirteen) nos. of schemes are
directly related to supplying of irrigation
water for cultivation and 1 (one) no. is
not irrigation oriented. Out of 13 (thirteen)
numbers irrigation oriented schemes, 10
(ten) nos. of schemes have been completed
and a total Potential of 1172 hect. for
Kharif Crops have been so far created through
the achievement of these schemes. The remaining
3 (three) nos. of schemes are also in progress.
In the Annual Operation Plan 2005-06,
the Irrigation Department has taken up 18
(eighteen) numbers of schemes in total both
new as well as renovation/improvement of
old schemes in Baksa district, out of which
16 (sixteen) nos. of schemes are directly
related to supplying of irrigation water
for cultivation and 2 (two) nos. of are
not irrigation oriented. Out of 16 (sixteen)
nos. irrigation oriented schemes, 15 (fifteen)
nos. of schemes have been completed and
a total Potential of 8230 hect. for both
Rabi and Kharif crops have so far been created
through the achievement of these schemes.
The remaining 1 (one) no. of scheme is also
in progress.
|
|
|
|
Kaurbaha P.T.W.S.
at Mudoikata
|
Ambari - Belguri
P.P.S.
|
In the Annual Operation Plan 2005-06,
the Irrigation Department has taken up 18
(eighteen) numbers of schemes in total both
new as well as renovation/improvement of
old schemes in Udalguri District, out of
which 16 (sixteen) nos. of schemes are directly
related to supplying of irrigation water
for cultivation and 2 (two) nos. of are
not irrigation oriented. Out of 16 (sixteen)
nos. irrigation oriented schemes, all the
schemes have been completed and a total
Potential of 2450 Hect. for Kharif Crops
have been so far created through the achievement
of these schemes.
A total potential of 17,252 Hectors for
both Rabi and Kharif crops have so far been
created after completion of 72 (seventy
two) numbers of irrigation oriented schemes
in the B.T.C. area. Rabi and Kharif potential
created by these schemes during 2005-06
are now being utilized by the cultivators
for production of Kharif crops and thereby
approximately 12,000 (twelve thousand) families
of BTAD in total are being benefited.
|
|
|
|
Repairing of Departmental
Rest House
at Bhairabkunda Irrigation Project
|
Jamuguri Bund at
Khoirabari
|
Thus most of the schemes, which were in
a very poor condition and were about to
collapse have been revived and made functional.
But still more is required to improve the
state of the schemes. The department, therefore,
has proposed to take up some new and repairing
of existing schemes for the coming years.
|
ACHIEVEMENT
DURING 2005-06
|
|
Sl.
No.
|
Name
of District
|
Name
of Project/Scheme
|
Target
for the Annual Plan
|
Target
achieved
|
Target
achieved
|
Potential
created in hectare
|
|
1
|
1
|
1
|
1
|
1
|
1
|
1
|
|
1
|
Kokrajhar
|
1. Improvement of Flow Irrigation
Scheme |
19
|
18
|
95%
|
5400
|
| 2. Improvement of E.L.I.S. |
5
|
4
|
80%
|
| 3. Improvement of D.T.W.S. |
1
|
1
|
100%
|
| 4. Improvement of Building |
3
|
3
|
100%
|
|
2
|
Chirang
|
1. Improvement of Flow Irrigation
Scheme |
13
|
10
|
83%
|
1172
|
| 2. Improvement of Building |
1
|
1
|
100%
|
|
3
|
Baksa
|
1. Improvement of Flow Irrigation
Scheme
|
15
|
14
|
93%
|
8230
|
| 2. Improvement of D.T.W.S. |
1
|
1
|
100%
|
| 3. Improvement of Building |
2
|
2
|
100%
|
|
4
|
Udalguri
|
1. Improvement of Flow Irrigation
Scheme |
16
|
16
|
100%
|
2450
|
| 2. Improvement of Building |
2
|
2
|
100%
|
|
Total
|
78
|
72
|
93%
|
17252
|
|
|