The condition of all the forest roads is worse than that of the roads in the civil areas. Hence there is a need of construction/repairing of a number of roads, bridges, culverts etc. inside forest areas those are required to enable the field staff to move around in the forest on field duties.
So far as the data available, the length of Forest Roads are given below:-

(1) Dhubri Division (Proposed Parbatjhora Forest Division) :- This Division has total 92.83 kms. length forest road falling under BTC.

The names of Forest Roads are:-

I.
Borobadha, Tipkai Forest Road
16.30 km,
II.
Borobadha, Machangdova Forest Road
3.06 km.
III.
Machangdera Satyapur Forest Road
5.35 km.
IV.
Ride-V Forest Road
3.21 km.
V.
Satyapur No.2 & Ride Forest Road
3.21 km.
VI.
Bashbari, Manglajhora Forest Road
9.65 km.
VII.
Kharkhari, Tipkai Forest Road
10.05 km.
VIII.
Bashbari, llarinchara Forest Road
6.00 km.
IX.
Bashbari, Barshijhora Forest Road
5.02 km.
X.
Rupshi, Paglijhora Forest Road
3.00 km.
XI.
Bashbari, Santipur Forest Road
6.00 km.
XII.
Makrijhora Tipkai Forest Road
12.00 km.
XIII.
Amtoli Deosankar Forest Road
2.25 km.
XIV.
Panijani, Tipkai Forest Road
8.00 km.
Total
92.83 km.

(2) Haltugaon Division :- This Division has got total 142.10 kms. length of Forest Road other than small village roads in the Forest Villages. There are 12 wooden bridges and 31 nos. of Hume Pipes/Culverts. Most of the wooden bridges are under deplorable condition and many of them are either completely damaged or no sign of bridge (s) ever existed.

The names of Forest Roads and length are given below :-

I.
Saralpara F.V. Road
4.00 km.
II.
B.S. road to I.B. Road
7.00 km.
III.
Laopani I.B. to Champa River Road
4.00 km.
IV.
Champa River to Khungring F.V. Road
2.00 km.
V.
Lalveta Road
8.00 km.
VI.
Hatisar to Bhur Road
17.00 km.
VII.
B.S. Road Mash Bhandar
3.00 km.
VIII.
B.S. Road to Chiknajhar
4.00 km.
IX.
Kakrikhola Salakati Road
7.00 km.
X.
Charaikhola Harinaguri Road
7.00 km.
XI.
Maligaon Forest Road
8.00 km.
XII.
Khalashi F.V.
3.00 km.
XIII.
Maligaon Depot to PL 7 Road
10.00 km.
XIV.
PL III Road from Bishmuri Sarbhang Road
3.50 km.
XV.
Mach Bhandar B.S. Road to PL-7
5.00 km.
XVI.
Perrys Road
8.00 km.
XVII.
New Protection Cell Road
2.00 km.
XVIII.
Central Path No. I
10.00 km.
XIX.
Central Path No. II
8.00 km.
XX.
Aminapara Road
3.00 km.
XXI.
Parallel II Road
3.00 km.
XXII.
Link Road in Sungsung PL - 2 to 3
1.60 km.
XXIII.
Haltugaon to Bishmuri Road
14.00 km.
Total =
142.10 km.

(3) Darrang Division (Proposed Udalguri Forest Division) :-

I.
Shikaridanga F.V. Road
2.5 km.
II.
Baskobari F.V. Road
1.5 km.
Total =
4.0 km.

Although, it is a fact that there are a number of Forest Road Bridges, Culverts etc. in other Forest Divisions including Wildlife Divisions, they are not given due to non furnishing of data/information by the concerned Divisions.