SECTOR A : RURAL
WATER SUPPLY
The Public Health Engineering Department
has played an important role in providing
safe drinking water at not covered and partially
covered villages by installing Hand Pumps
(M-ill, M-II, Hand Tube Well, Tara Hand
Pump, Singur Hand Pump) and Ring Wells.
Specially in the northern part of BTC (Bhutan
foot-hills) which can be referred as boulder
zone, where normal boring is not possible,
the BTC authority has initiated rig boring
in that area. After formation of BTC, authorities
have taken strong steps to provide safe
drinking water through rig boring in the
area. PHED has installed many M-III by rig
boring in that area within a short period
which was not done in the past decades.
The Department is also supplying safe drinking
water from the pipe water supply scheme
to the community. The department has renovated
many ill-fated schemes in the last few years.
The PHED, BTC is always alert to provide
pure and safe drinking water in the time
of floods. The water sources in the relief
camps are also disinfected with bleaching
powder, alum etc. when there is breakout
of cholera, diarrhoea and dysentery in the
villages.
The PHED of BTC is providing potable drinking
water through water tanker in workshops,
seminar, meeting and exhibition etc. as
and when called for urgent requirement of
drinking water.
The Hon'ble Executive Member, PHED, BTC
Mr. Derhasat Basumatary has personally taken
keen interest in successful implementation
of spot source and piped water supply schemes
and has been monitoring after regular intervals.
HATISAR WATER
SUPPLY SCHEME
| 1. |
Name of the Scheme |
Hatisar Water Supply
Scheme |
| 2. |
Project area |
Approx. 3.0 Sq.
Km. |
| 3. |
Population covered |
3,500 souls |
| 4. |
Source of Water |
Deep Tube Well. |
| 5. |
Distribution Network |
7.03 Km covered. |
| 6. |
Service to user |
Round the clock
service at a minimum head of 5
metres. water head at ferrule
point. |
| 7. |
Project Viavility |
Approved by all
concerned departments from Cost-benefit
ratio and socio economic point
of view. |
| 8. |
Project Cost |
Rs. 23.80 Lakhs |
| 9. |
Project implementing
Agency |
Public Health Engineering
Department,
Kokrajhar (PHE) Division No.-II |
| 10. |
Year of Completion |
During 2006. |
| 11. |
Village/Habitation
covered |
Dadgiri, Sonapur,
Debadangi, Khagrabari |
| 12. |
Project/Programme |
S.C.A. to TSP. |
|
Subankhata Water
Supply Scheme (Under Baksa District )-
Subankhata Water Supply Project was sanctioned
in the BTC economic special package considering
the cluster of villages. The salient features
of the project are:
Subankhata is one of the major revenue villages
under Tamulpur Civil Sub-Division of Baksa
District. Exponential growth rate has been
observed in recent time. In these Indo-Bhutan
area boarders and has tremendous potential
for future expansion in the purview of long
term development in the field of tourism
and agriculture / bio-technology based industry.
The project will
cover a population of 15,344, having a cluster
of villages-
1. UttarKuchi
2. DakhinKuchi
3. Maithabari
4. Japadang
5. Monipur
6. Subankhata
The scheme is a combination of gravity fed
and pumping system having conventional treatment
process such as cascade gravity acration,
flush mixture, chemical mixing, clarification,
filtration and disinfection-etc.
The scheme will have service reservoir of
380 cubic metre capacity, treatment plant
of 2.50 MLD having 32.50 KM length distribution
network covering entire cluster village
of the Subankhata area. The scheme will
provide water for domestic need such as
drinking, cooking, bathing, washing etc.
through house connection.
The project cost is Rs. 326.00 lakh and
after completion the project will managed
by the
WATSAN COMMITTEE.
|